Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of
hydroelectric Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined and ...
generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as pondage. A plant without pondage is subject to seasonal river flows, thus the plant will operate as an intermittent energy source. Conventional hydro uses reservoirs, which regulate water for flood control, dispatchable electrical power, and the provision of
fresh water Fresh water or freshwater is any naturally occurring liquid or frozen water containing low concentrations of dissolved salts and other total dissolved solids. Although the term specifically excludes seawater and brackish water, it does include ...
for agriculture.


Concept

Run-of-the-river, or ROR, hydroelectricity is considered ideal for streams or rivers that can sustain a minimum flow or those regulated by a lake or reservoir upstream. A small dam is usually built to create a headpond ensuring that there is enough water entering the penstock pipes that lead to the turbines, which are at a lower elevation. Projects with pondage, as opposed to those without pondage, can store water for daily load demands. In general, projects divert some or most of a river's flow (up to 95% of mean annual discharge)Knight Piesold Consulting
Plutonic Hydro Inc. Bute Inlet Project. Summary of Project Intake and Turbine Parameters
Knight Piesold Consulting.
through a pipe and/or tunnel leading to electricity-generating turbines, then return the water back to the river downstream.Douglas T, Broomhall P, Orr C. (2007)
Run-of-the-River Hydropower in BC: A Citizen's Guide to Understanding Approvals, Impacts and Sustainability of Independent Power Projects
/ref> Run-of-the-river projects are dramatically different in design and appearance from conventional hydroelectric projects. Traditional hydroelectric dams store enormous quantities of water in reservoirs, sometimes flooding large tracts of land. In contrast, run-of-river projects do not have the disadvantages associated with reservoirs and so cause fewer environmental impacts.Hydromax Energy Limited
Hydromax Energy Limited website
/ref> The use of the term "run-of-the-river" for power projects varies around the world. Some may consider a project run-of-the-river if power is produced with no water storage, but limited storage is considered run-of-the-river by others. Developers may mislabel a project run-of-the-river to soothe public perception about its environmental or social effects. The European Network of Transmission System Operators for Electricity distinguishes ''run-of-the-river and pondage hydropower'' plants, which can hold enough water to allow generation for up to 24 hours (reservoir capacity / generating capacity ≤ 24 hours), from ''reservoir hydropower'' plants, which hold far more than 24 hours of generation without pumps. The Bureau of Indian Standards describes run-of-the-river hydroelectricity as:
A power station utilizing the run of the river flows for generation of power with sufficient pondage for supplying water for meeting diurnal or weekly fluctuations of demand. In such stations, the normal course of the river is not materially altered.
Many of the larger run-of-the-river projects have been designed to a scale and generating capacity rivaling some traditional hydroelectric dams.Plutonic Power (2008)
Revised Project Description for Bute Inlet Hydroelectric Project Requirements. P1
Plutonic Power.
For example, the Beauharnois Hydroelectric Generating Station in Quebec is rated at 1,853 MW. Some run-of-the-river projects are downstream of other dams and reservoirs. The reservoir was not built by the project but takes advantage of the water supplied by it. An example would be the 1995 1,436 MW La Grande-1 generating station. Previous upstream dams and reservoirs were part of the 1980s James Bay Project. There are also small and somewhat-mobile forms of a run-of-the-river power plants. One example is the so-called ''electricity buoy'', a small floating hydroelectric power plant. Like most buoys, it is anchored to the ground, in this case in a river. The energy within the moving water propels a power generator and thereby creates electricity. Prototypes by commercial producers are generating power on the Middle Rhine river in Germany and on the Danube river in Austria.


Advantages

When developed with care to footprint size and location, run-of-the-river hydro projects can create sustainable energy minimizing impacts to the surrounding environment and nearby communities. Advantages include:


Cleaner power and fewer greenhouse gases

Like all hydro-electric power, run-of-the-river harnesses the natural potential energy of water by eliminating the need to burn coal or natural gas to generate the electricity needed by consumers and industry. Moreover, run-of-the-river hydroelectric plants do not have reservoirs, thus eliminating the methane and carbon dioxide emissions caused by the decomposition of organic matter in the reservoir of a conventional hydroelectric dam. That is a particular advantage in tropical countries, where methane generation can be a problem.


Less flooding

Without a reservoir, flooding of the upper part of the river does not take place. As a result, people remain living at or near the river and existing habitats are not flooded. Any pre-existing pattern of flooding will continue unaltered, which presents a flood risk to the facility and downstream areas.


Disadvantages


"Unfirm" power

Run-of-the-River power is considered an "unfirm" source of power: a run-of-the-river project has little or no capacity for energy storageDouglas, T. (2007)
"Green" Hydro Power: Understanding Impacts, Approvals, and Sustainability of Run-of River Independent Power Projects in British Columbia
Watershed Watch.
and so cannot co-ordinate the output of electricity generation to match consumer demand. It thus generates much more power when seasonal river flows are high (spring freshet),Wilderness Committee
Wilderness Committee Comments on the Draft Terms of Reference, Bute Inlet Hydroelectric Private Power Project. Letter to Kathy Eichenberger, Project Assistant Director. P1
Wilderness Committee.
and depending on location, much less during drier summer months or frozen winter months. The plant will probably have a lower head of water than from a dam, and will thus generate less power.


Availability of sites

The potential power at a site is a result of the
head A head is the part of an organism which usually includes the ears, brain, forehead, cheeks, chin, eyes, nose, and mouth, each of which aid in various sensory functions such as sight, hearing, smell, and taste. Some very simple animals may ...
and flow of water. By damming a river, the head is available to generate power at the face of the dam. A dam may create a reservoir hundreds of kilometres long, but in run-of-the-river the head is usually delivered by a canal, pipe or tunnel constructed upstream of the power house. The cost of upstream construction makes a steep drop desirable, such as falls or rapids.


Environmental impacts

Small, well-sited run-of-the-river projects can be developed with minimal environmental impacts. Larger projects have more environmental concerns. For fish-bearing rivers, a ladder may be required, and dissolved gases downstream may affect fish. In British Columbia, the mountainous terrain and wealth of big rivers have made it a global testing ground for 10–50 MW run-of-river technology. As of March 2010, there were 628 applications pending for new water licences solely for power generation, representing more than 750 potential points of river diversion.IPPwatch.com website
IPPwatch.com
.


Concerns

* Diverting large amounts of river water reduces river flows, affecting water velocity and depth, reducing habitat quality for fish and aquatic organisms; reduced flows can lead to excessively warm water for salmon and other fish in summer. * In undeveloped areas, new access roads and transmission lines can cause
habitat fragmentation Habitat fragmentation describes the emergence of discontinuities (fragmentation) in an organism's preferred environment (habitat), causing population fragmentation and ecosystem decay. Causes of habitat fragmentation include geological processes ...
, allowing the introduction of invasive species. * The lack of reservoir storage may result in intermittent operation, reducing the project's viability.


Major examples

* Jirau Dam,
Rondônia Rondônia () is one of the 26 states of Brazil, located in the northern subdivision of the country (central-western part). To the west is a short border with the state of Acre, to the north is the state of Amazonas, in the east is Mato Grosso, ...
, Brazil (under construction) * Santo Antônio Dam,
Rondônia Rondônia () is one of the 26 states of Brazil, located in the northern subdivision of the country (central-western part). To the west is a short border with the state of Acre, to the north is the state of Amazonas, in the east is Mato Grosso, ...
, Brazil (under construction) * Chief Joseph Dam, Washington, United States * John Day Dam, Oregon/Washington, United States *
Beauharnois Hydroelectric Power Station The Beauharnois generating station is a run-of-the-river hydroelectric power station along the Saint Lawrence Seaway on the Saint Lawrence River, in Quebec, Canada. The station was built in three phases, and comprises 36 turbines, capable of ...
, Quebec, Canada, * The Dalles Dam, Oregon/Washington, United States * Teles Pires Dam, Brazil * Inga Dams, Democratic Republic of the Congo * Satluj Jal Vidyut Nigam Ltd, Satluj River, Shimla, India, * Ghazi-Barotha Hydropower Project, Khyber Pakhtunkhwa, Pakistan * Gezhouba Dam, Yichang, Hubei, China


See also

* Environmental impact of electricity generation * Environmental impacts of reservoirs * Hydropower * Small hydro * Micro hydro *
Pico hydro Pico hydro is a term used for hydroelectric power generation of under 5 kW. These generators have proven to be useful in small, remote communities that require only a small amount of electricity for example, to power one or two fluorescent l ...
* Gravitation water vortex power plant


Notes


References

* Freedman, B., 2007, Environmental Science: a Canadian Perspective; 4th edition, Pearson Education Canada, Toronto, pp 226,394. {{DEFAULTSORT:Run-Of-The-River Hydroelectricity Hydroelectricity